Home > Factory Productivity and Scheduling > Getting Started > Setting Up Processes
Setting Up Processes
Processes are steps carried out in your manufacturing operation – examples of Processes are cut, assemble, etc.
To set up Processes in Empower Time Track, from the main menu, go to Set Up > Process.
Under Process Name, type in Make Legs, then under Process Group Name select Factory.
Leave Capacity at 0 and Process Description blank at this stage and then click Add.
In the next line, type in Make Top and Factory and in the next line Make Seat and Factory and then Assembly and Factory.
If you make a mistake, either click on Edit to edit your work.
Your page should look something like
The default sort on this page is to display Processes in the order that they have been entered into Empower - note for example that Assemble is at the top of the list.
To change the order simply drag and drop the appropriate Processes around - e.g. you may wish to display Assemble after the Make Seat Process as highlighted below.
If you find you cannot drag and drop the Processes around try refreshing the page in your browser before doing the drag and drop.
When choosing Processes decide on the steps that you wish to break your Products down into to track the associated times.
These need to be practical sized Processes. Empower recommends you approach this in two stages
- Stage One - when you start to use Empower Time Track - have fewer Processes which might involve grouping a number of Tasks together.
- Stage Two - when you are three months down the track in using Empower Time Track you may wish to get more detail by splitting your Processes into more detail.
Fewer Processes allows for simplicity – i.e. fewer issues and problems understanding and learning Empower Time Track.
Empower recommends that the
- Number of Processes should initially be (on average) between two and five per Product
- Expected time to complete each Process be between 15 minutes and twenty four hours. If Processes take less than 15 minutes you may be getting too detailed.
Once you have set up your Processes you can start Setting Up Products.
See also
Capacity By Process
See also
|