Kitchens R Us (Tauranga, New Zealand)

Kitchens R Us (Tauranga, New Zealand)

40% Increase in Factory Productivity

“We have significantly increased our annual production and turn over whilst at the same time reduced 2.5 to 3 staff. Overall our factory productivity has increased by an estimated 40%. Empower Software has saved us $120,000 per year in wage costs.  

In 7 years we have not missed one install date. 

I could NOT operate and grow my business as I do without Empower software.

Russell Reardon, Managing Director, +64 21 725 137 mb

(08/07/2014)