Makaira Boats – A Success Story
(Keri Keri, New Zealand)
“In 2018 Allan invested in tablets for his factory floor, labour management and scheduling software. Since investing in factory tablets and labour software, build times and build cost on each boat has reduced by 30% within 11 months and he is confident that the company will reach 50% reduction in build time and build cost within the next 6 months. Allan says the advantages of this labour management technology are many and significant including: 30% going onto 50% reduction in build time and build cost per boat, allowing Makaira Boats to be one of the highest quality ‘heavy plate and heavy engineered’ boats on the market, whilst also being very competitively priced. “This is what all my clients are looking for…” Allan Shaw, Managing Director