Donovan Engineering (Whangarei, New Zealand)

Donovan Engineering (Whangarei, New Zealand)

30% Increase in Factory Productivity

“We have witnessed the following 10 Productivity Increases using Empower Software:

1. Having Empower in for only 4 months we had dropped our nightshift and maintained same level of production…

3. All forms of time that factory staff stole in working hours during the day has been practically eliminated…

8. Having Empower in for only 4 months our lead time on jobs being completed for clients had dropped from 15 days average to 7 days average. This was a massive improvement in our customer service…

10. Overall I estimate our total factory productivity increase using Empower to date is 30%.”

Kyle Donovan, Director, +64 9 438 1562, +64 21 456 158