86% Factory Productivity Increase, within 6 Months
“The first client that I installed Empower Software into was Peppertree Furniture.
· At 3 months, factory productivity had increased by 46%
· At 6 months, factory productivity had increased by 86%
· At 3 years factory productivity had increased by 100%, which was making them $200,000 additional profit per year.
If I owned a joinery, furniture manufacturing or engineering business today, I would not be without tablets on the factory floor and Empower Factory Productivity and Scheduling Software throughout.”
Brendan Hanna, Director
(12/10/2016)