Empower
For composite manufacturers

From layup to dispatch, every minute attributed

Composite and advanced materials manufacturing involves long cure cycles, complex routings, and tight QA. Empower captures the data you need to run a lean, profitable floor.

Composite Materials workshop
What we solve

Built for the composite materials floor

Composite and advanced materials manufacturing involves long cure cycles, complex routings, and tight QA. Empower captures the data you need to run a lean, profitable floor.

Composite Materials workshop floor

Long cure cycles, idle labour

Hours of cure time can hide huge labour leakage. Empower distinguishes value-added time from idle time and routing.

Strict QA & traceability

Composite jobs need batch-level traceability for materials, cure profiles, and operator sign-offs. Empower captures all of it.

Specialised skill matching

Layup, infusion, demoulding, finishing — each demands different skills. Empower routes by capability.

Output growth without headcount

Composite Group shrank the floor from 25 to 18 while holding output flat. The data showed where the slack was.

Composite Materials stories

How composite materials shops are winning with Empower

Composite Group

38% Productivity Increase

Same weekly output, fewer hands: the floor shrank from 25 to 18 staff and productivity climbed 38% — plus a meaningful annual wage saving.

Read the story

25% Increase in Factory Productivity

By moving to a job-and-staff management system with the reporting depth to back it up, Strata achieved a 25% productivity lift in their first two years on Empower.

Read the story

25% Reduction in Labour Times

Allflex integrated their SAP system directly with Empower — every new order instantly available for scheduling — and replaced manual spreadsheets with budgeted-time task plans. The result: a 25% reduction in labour times.

Read the story
McMullen & Wing

38% Increase in Productivity

A world-class superyacht builder replaced paper-based tracking with Empower — instant feedback on job status and performance, and weeks of manual data entry shrunk to minutes.

Read the story
Composite Group

38% Productivity Increase

Same weekly output, fewer hands: the floor shrank from 25 to 18 staff and productivity climbed 38% — plus a meaningful annual wage saving.

Read the story

25% Increase in Factory Productivity

By moving to a job-and-staff management system with the reporting depth to back it up, Strata achieved a 25% productivity lift in their first two years on Empower.

Read the story

25% Reduction in Labour Times

Allflex integrated their SAP system directly with Empower — every new order instantly available for scheduling — and replaced manual spreadsheets with budgeted-time task plans. The result: a 25% reduction in labour times.

Read the story
McMullen & Wing

38% Increase in Productivity

A world-class superyacht builder replaced paper-based tracking with Empower — instant feedback on job status and performance, and weeks of manual data entry shrunk to minutes.

Read the story
Composite Group

38% Productivity Increase

Same weekly output, fewer hands: the floor shrank from 25 to 18 staff and productivity climbed 38% — plus a meaningful annual wage saving.

Read the story

25% Increase in Factory Productivity

By moving to a job-and-staff management system with the reporting depth to back it up, Strata achieved a 25% productivity lift in their first two years on Empower.

Read the story

25% Reduction in Labour Times

Allflex integrated their SAP system directly with Empower — every new order instantly available for scheduling — and replaced manual spreadsheets with budgeted-time task plans. The result: a 25% reduction in labour times.

Read the story
McMullen & Wing

38% Increase in Productivity

A world-class superyacht builder replaced paper-based tracking with Empower — instant feedback on job status and performance, and weeks of manual data entry shrunk to minutes.

Read the story
What's possible

Real numbers from real composite materials shops

38%

Productivity increase

From McMullen & Wing
28%
Smaller floor at the same weekly output
From Composite Group
25%
Reduction in labour times
From Allflex Livestock
The Empower Guarantee

We guarantee your productivity gains.

20–40%in your first year, guaranteed. Don't see it? We provide unlimited support — free of charge — until you do.

Calculate Your Gains

Ready to run a tighter composite materials floor?

See what Empower could do for your workshop. Get an instant quote, or book a 30-minute call to see it running on a shop like yours.